An intelligent dispatch and delivery platform that brings route planning, live fleet visibility, driver coordination, and operational performance into one clear control system.
THE PROJECT
Turning a complex delivery day into one legible, intelligent, and continuously updated operating system.
Dispatch teams were losing time across spreadsheets, phone calls, disconnected driver updates, and manually planned routes. Once vehicles left the warehouse, operational visibility dropped and small delays could quickly become expensive delivery exceptions.
02 / OUR RESPONSE
Turning strategy into experience.
We designed Spaces around a simple operating loop: import orders, generate balanced routes using zones, capacity, traffic, and service windows, then dispatch and track every run live. AI-assisted planning, current ETAs, proof of delivery, and performance analytics help teams make faster decisions from one workspace.
01The next shipment, parcel count, address, and ETA stay visible without taking the driver away from the route.
02A live operations view surfaces delayed shipments alongside their assigned truck, driver, delivery date, and destination.
03A focused shipment report turns fleet performance, delivery status, and delayed exceptions into one clear operational review.
WHAT WE DELIVERED
The scope of our work.
01Product strategy
02Logistics UX and UI design
03AI-assisted route optimisation
04Platform and API development
05Live tracking and analytics
DELIVERED FEATURES
PlanRoute planning and dispatch workflowsTrackFleet visibility and delivery statusReviewShipment reports and operational analytics
Outcome evidence
The features above describe the product work. Measured business outcomes are not published for this project; they should not be read as claims of revenue growth, time saved or improved performance.